WASHINGTON (UPI) — The United States’ three-ship space shuttle fleet faces “significant challenges” in its future orbiter work, the U.S. government has warned.

The Government Accountability Office told Congress that completing construction and continuing operation of the $31 billion International Space Station raised the possibility of severe cutbacks, the Houston Chronicle reported from Washington.

Cristina Chaplain of Congress’ watchdog agency told a House of Representatives aeronautics subcommittee that NASA must overcome immense odds to complete assembly of the space station on time. Eight shuttle missions are scheduled before the fleet’s retirement in 2010.

Copyright 2008 by United Press International
arcamax.com

Leave a comment

Name: (Required)

eMail: (Required)

Website:

Comment:

 

Resources

Hi dear friends and visitors!! thanks for visiting me here!! Have a great and blessed day!!




WANT TO EXCHANGE LINK WITH ME? READ HERE FIRST

Extras

    Top Photo blog blogs Digg! Directory of Computers/Tech Blogs

    Personal Development Blog Directory Get listed at www.millionbloglist.com